Single-Source Risk Model

Every part you buy from a single supplier, priced: what it costs if that supplier closed tomorrow, the chance of a shortfall this year, and which fix is likely to pay for itself, on your numbers.

20,000 simulated years on each part's page6 causes of disruption5 fixes priced for every partup to 32 what-if tests per partYour numbers stay on your device

These are example parts. Don't enter export-controlled technical data, Controlled Unclassified Information, classified information, or part numbers your company treats as sensitive; use codes such as "Part 101." Everything runs on this device: nothing you enter is sent to Foley Strategic Advisory or anyone else. How your data is handled

Most years cost nothing; a few cost a lot. The average spreads those over many years.

Where the risk sits

Bubble size = average yearly loss. Numbers are ranks in the list below.

Top right: a shortfall is both likely and costly. Bottom right: frequent but cheap. Top left: rare but severe; compare its 1-in-100 year with what the business could absorb.

For a bubble's full name and numbers, point at it, or tab to the chart and use the arrow keys.

Show as table

Suggested funding order

Most loss avoided per dollar first. Some parts appear twice: a cheap first step, then a bigger one if the budget allows.

Every part, ranked by average yearly loss

Doing nothing versus each part's best fix
#PartSupplierIf the supplier closed tomorrowChance of a shortfall / yrAverage loss / yr1-in-100 yearBest fixCash needed in year oneYearly savings after fix costOpen

Parts with the same supplier name share that supplier's disruptions in every simulated year, so the all-parts 1-in-100 year reflects the concentration.

Your single-source parts

No controlled data. Don't enter Controlled Unclassified Information, export-controlled technical data, federal contract information, classified information, part numbers, drawing numbers or program names. Use codes such as "Part 101" and "Supplier A."

PartSupplierTypeYearly spendRevenue that needs itMargin lost %Weeks of stockWeeks to replaceSupplier riskRemove

Spend and revenue accept 1.8M, 1.8MM, 800K or plain numbers. Margin lost: contribution margin is best; gross margin works. Weeks of stock: on hand plus confirmed in transit, at today's usage. Weeks to replace: from losing this supplier to first good parts from a new one, including qualification. Open a part for the 45 settings behind these defaults. Lists of thousands of parts work: paste them in, and the table pages 50 rows at a time.